Wobide Machinery(Zhejiang)Co., Ltd. is a solid waste recycle machinery manufacturer that engaged in design, development, production and sales.
1) The crusher machine should be grounded reliably, the installation should be stable, and there should be enough operating space; before starting the machine, check whether the bolts of each part are loose, check the use of the tool, and check whether there are debris in the box; the start button should be flexible, and the machine should be sound. To be normal, it is strictly forbidden to start without phase; it is strictly forbidden to put metal materials and parts into the feeding port; the cutting edge of the blade should always be kept sharp.
2) The starting procedure of this machine is: turn on the power supply - start the power supply - start the main engine oil pump - start the main engine - push the material box action - feeding (after confirming that everything is normal)
The shutdown procedure of this machine is: stop feeding, after the remaining material in the standby is crushed (can be judged from the sound of the broken material) - the main engine stops (and the push box stops moving) - the oil pump stops - cut off the power supply
3) The pusher box has two working states to choose from. After the feeding, the oil pump and the main engine are started, the pusher box can automatically go back and forth. After starting, press "forward" and "backward" to manually control forward and backward.
4) Due to the high crushing efficiency of the crusher, during operation, the crushed material in the receiving hopper should be observed frequently. Push a little, reverse the host, and continue to work after it is normal.